Tuesday – August 28,
2012 – Travel Day: Butler OH – Crawfordsville IN
Looks like we may have a standard forming around our leaving
time ritual. It’s taking us around 1.5 to 2 hours to fully
pack up and be ready to move. This
morning it took the entire 2 hours as we needed to go to the dump station at
the campsite. Were on the road by 11 am
and had 288 miles to travel today.
Today we were going to finally be traveling flat roads so we
could see how the fuel mileage was without the hills. We went from 8 MPH to 9.5 MPH which I think
is pretty good. Just wish the truck had
better mileage by its self without pulling.
But for pulling it is pretty good.
We arrived at the campsite in Crawfordsville (my home town)
around 4:30 pm. The site is the best we
have had so far. It is a pull through
with full hook-ups and 50A electrical.
We have the se-up routine down now it seems. It took us about 30 minutes to set up.
Patty’s right elbow was hurting her more so we decided to
take her to the hospital here and see if it is more than just a bruise. After a 2 hour wait and an x-ray we found out
that it was just a bruise. She got some
really good pain meds and we were off to see the grandkids J
We stopped for a pizza and Patty got her prescription filled
and then we went over to see the grandkids.
They were allowed to stay up to see us as long as they promised to get
up for school in the morning. Even at
8:30 everybody had pizza.
Tomorrow everybody comes to visit us at the campground!
Stay tuned!
No comments:
Post a Comment